Desain dan RAB Prasarana Air Bersih (Pipanisasi)














DESA PASIR BERDENGUNG KECAMATAN PASIR LAUT
TAHUN ANGGARAN 2020
Bidang  : Pelaksanaan Pembangunan Desa (2)
Sub Bidang  : Kawasan Permukiman (2.4.)
Kegiatan  : Pembangunan Sambungan Air Bersih ke Rumah Tangga (Pipanisasi) (2.4.12.)
Paket Kegiatan  : Pembangunan Broncaptering dan Pipanisasi Sepanjang 2.142 meter
Waktu Pelaksanaan  : 60 (enam puluh hari kalender)
Rincian Pendanaan  :
NO. U  R  A  I  A  N VOLUME HARGA SATUAN  (Rp) JUMLAH (Rp)
1 2 3 4 5
I. BAHAN
Broncaptering  (1 unit):
1 Semen @ 50 Kg 79.00 Zak 110,000.00 8,690,000.00
2 Batu 2/3  9.00 M3 350,000.00 3,150,000.00
3 Pasir Beton 8.00 M3 355,000.00 2,840,000.00
4 Besi � 8 mm - 12 m 63.00 Btg 58,000.00 3,654,000.00
5 Kawat Ikat 6.00 Kg 22,000.00 132,000.00
6 Papan Mal 48.00 Kpg 30,000.00 1,440,000.00
7 Paku Campur 3.00 Kg 23,000.00 69,000.00
8 Pipa Saringan Besi  � 4" 1.00 Bh 1,455,000.00 1,455,000.00
9 Pipa Bilas 3"-4m 1.00 Bh 125,000.00 125,000.00
Perpipaan (2.142 meter):
10 Pipa Besi (Galvanis) � 4"-6m 1.00 Btg 1,750,000.00 1,750,000.00
11 Pipa PVC AW � 4"-6 m 30.00 Btg 405,000.00 12,150,000.00
12 Pipa PVC AW � 3"-6 m 50.00 Btg 295,000.00 14,750,000.00
13 Pipa PVC AW � 2"-6 m 277.00 Btg 165,000.00 45,705,000.00
14 Reduser 4" ke 3" 1.00 Bh 180,000.00 180,000.00
15 Reduser 3" ke 2" 1.00 Bh 132,000.00 132,000.00
16 Reduser 2" ke 1" 1.00 Bh 75,000.00 75,000.00
17 Stop Kran ( Gate Valve) 4" 1.00 Bh 1,150,000.00 1,150,000.00
18 Lem Pipa 7.00 Kg 30,000.00 210,000.00
Tandon Air (1 unit):
19 Kayu Belian 9/9 - 4 m 2.00 Btg 200,000.00 400,000.00
20 Kayu Belian 4/9 - 4 m 7.00 Btg 100,000.00 700,000.00
21 Kayu Belian 7/7 - 4 m 1.00 Btg 190,000.00 190,000.00
22 Kayu Belian 4/6 - 4 m 2.00 Btg 90,000.00 180,000.00
23 Papan Belian 3.00 Kpg 130,000.00 390,000.00
24 Paku Belian 1.00 Kg 33,000.00 33,000.00
25 Fiberglass 1.500 Ltr (setara Penguin) 1.00 Bh 1,800,000.00 1,800,000.00
26 Pipa PVC AW � 3/4" - 4 m 2.00 Btg 40,000.00 80,000.00
27 Baut 24.00 Bh 10,000.00 240,000.00
28 Stop Kran  3/4" 1.00 Bh 20,000.00 20,000.00
29 Lem Pipa 1.00 Klg 30,000.00 30,000.00
Kran Umum (4 unit)
30 Besi dia. 8 - 12 m 2.00 Btg 58,000.00 116,000.00
31 Kawat Ikat 1.00 Kg 22,000.00 22,000.00
32 Papan Mal 1.00 Kpg 30,000.00 30,000.00
33 Paku Campur 1.00 Kg 23,000.00 23,000.00
34 Semen @ 50 Kg 5.00 Zak 110,000.00 550,000.00
35 Batu uk. 2/3  1.00 M3 350,000.00 350,000.00
36 Pasir Beton 1.00 M3 355,000.00 355,000.00
37 Kran Stop 3/4" 8.00 Bh 20,000.00 160,000.00
38 Pipa PVC AW 3/4"-4m 2.00 Btg 40,000.00 80,000.00
39 T - Bow 3/4" 4.00 Bh 15,000.00 60,000.00
40 L - Bow 3/4" 4.00 Bh 11,000.00 44,000.00
41 Sealtape 2.00 Bh 5,000.00 10,000.00
42 Lem Pipa 1.00 Klg 30,000.00 30,000.00
Jumlah Bahan 103,550,000.00
II. SEWA ALAT  (sesuai keperluan)
1. Gerobak Dorong 2.00  Bh  200,000.00 400,000.00
Jumlah Alat 400,000.00
III. UPAH
1. Pekerja           204.80 HOK 85,000.00 17,408,000.00
2. Tukang             98.00 HOK 120,000.00 11,760,000.00
3. Kepala Tukang             41.20 HOK 140,000.00 5,768,000.00
4. Mandor             20.00 HOK 120,000.00 2,400,000.00
364.00 HOK Jumlah Upah 37,336,000.00
IV. HONOR TPK 
1. Ketua 1.00 org 450,000.00 450,000.00
2. Sekretaris 1.00 org 400,000.00 400,000.00
3. Anggota 2.00 org 350,000.00 700,000.00
(Perbup Sanggau No. 1 Thn. 2019)
4.00 org Jumlah Honor TPK 1,550,000.00
J  U  M  L  A  H  (Rp.) 142,836,000.00
Pasir Bedengung, 5 Februari 2020
Disetujui :
Kepala Desa Pasir Bedengung Kasi Kesejahteraan
Bunga Citra Lovestory, SH. Ramlee