Desain dan RAB Pembangunan Polindes (Konstruksi Kayu)











RENCANA  ANGGARAN  BIAYA (RAB)
DESA PASIR BERDENGUNG KECAMATAN PASIR LAUT
TAHUN ANGGARAN 2020
Bidang  : Pelaksanaan Pembangunan Desa (2)
Sub Bidang  : Kesehatan (2.2.)
Kegiatan  : Pembangunan Polindes (2.2.09.)
Pembangunan Polindes RT. 1 RW. 2 Dusun Bahagia uk. 6 m x 9 m. 1 unit
Waktu Pelaksanaan  : 30 (tiga puluh hari kalender)
Rincian Pendanaan  :
NO. U  R  A  I  A  N VOLUME HARGA SATUAN  (Rp) JUMLAH (Rp)
1 2 3 4 5
I. BAHAN (harga hanya contoh)
1 Semen Portland @50 Kg             95.00 Zak 90,000 8,550,000.00
2 Semen Putih                 1.0 Kg 10,000 10,000.00
3 Pasir Beton             12.00 M� 160,000 1,920,000.00
4 Batu Pecah 2/3 Cm               3.00 M� 500,000 1,500,000.00
5 Batako Uk. 7 x 15 x 30 Cm        3,900.00 Bh 2,500 9,750,000.00
6 Keramik 30 x 30 cm               3.00 Ktk 70,000 210,000.00
7 Keramik 20 x 20 cm             63.00 Ktk 60,000 3,780,000.00
8 Kayu Belian 9/9-400 Cm             40.00 Btg 250,000 10,000,000.00
9 Kayu Belian 8/8-400 Cm             52.00 Btg 215,000 11,180,000.00
10 Kayu Belian 4/8 - 400 Cm             45.00 Btg 103,000 4,635,000.00
11 Kayu Klas I 8/8 - 400 Cm             59.00 Btg 81,000 4,779,000.00
12 Kayu Klas I 5/10 - 400 Cm               7.00 Btg 75,000 525,000.00
13 Kayu Klas II 8/12 - 400 Cm             60.00 Btg 157,000 9,420,000.00
14 Kayu Klas II 6/12 - 400 Cm              14.00 Btg 150,000 2,100,000.00
15 Kayu Klas II 5/10 - 400 Cm               6.00 Btg 66,000 396,000.00
16 Kayu Klas II 5/7 - 400 Cm             60.00 Btg 32,000 1,920,000.00
17 Kayu Klas II 4/6 - 400 Cm             84.00 Btg 24,000 2,016,000.00
18 Kayu Klas II 2/3 - 400 Cm           130.00 Btg 15,000 1,950,000.00
19 Papan Mall Klas III 2/18 - 4 m             97.00 Btg 21,000 2,037,000.00
20 Papan Belian tdk ketam 2/18 - 4 m             21.00 Btg 140,000 2,940,000.00
21 Papan Klas I Ketam 2/15 - 4 m             28.00 Kpg 46,000 1,288,000.00
22 Amplas             25.00 Lbr 5,000 125,000.00
23 Dempul             25.00 Kg 15,000 375,000.00
24 Cat Tembok             69.00 Kg 30,000 2,070,000.00
25 Cat Kilat/Cat Minyak             14.00 Kg 75,000 1,050,000.00
26 Cat Dasar             11.00 Kg 25,000 275,000.00
27 Thinner               4.00 Ltr 27,000 108,000.00
28 Residu/Teer             10.00 Ltr 28,000 280,000.00
29 Besi Plat Beugel             24.00 Bh 20,000 480,000.00
30 Besi Tulangan Polos dia. 8 mm             36.00 Btg 45,000 1,620,000.00
31 Baut Bangunan           178.00 bh 5,000 890,000.00
32 Paku Campuran             18.00 Kg 22,000 396,000.00
33 Paku Atap             13.00 Kg 25,000 325,000.00
34 Paku Pafond (GRC)             15.00 Kg 10,000 150,000.00
35 Kunci Pintu                5.00 set 60,000 300,000.00
36 Engsel Pintu             15.00 set 40,000 600,000.00
37 Engsel Jendela             22.00 set 50,000 1,100,000.00
38 Slot Jendela             11.00 set 10,000 110,000.00
39 Kait Angin             22.00 set 10,000 220,000.00
40 Atap Seng Gelombang Warna           148.00 Lbr 80,000 11,840,000.00
41 Seng Polos BJLS 0.30               3.00 Lbr 60,000 180,000.00
42 Pintu Panel Kayu Belian               1.00 Bh 1,500,000 1,500,000.00
43 Pintu Panel Kayu Klas I               4.00 Bh 1,000,000 4,000,000.00
44 Jendela Kaca Jungkit             11.00 Bh 350,000 3,850,000.00
45 Ventilasi Kayu             19.00 Bh 250,000 4,750,000.00
46 GRC 4mm (1,2m x 2,4m)             26.00 Lbr 75,000 1,950,000.00
47 Kloset Jongkok                2.00 Bh 150,000 300,000.00
48 Kran Air               2.00 Bh 15,000 30,000.00
49 Floordrain               2.00 Bh 30,000 60,000.00
50 Pipa PVC 4"               2.00 Btg 147,000 294,000.00
51 Pipa PVC 2"               4.00 Btg 88,000 352,000.00
52 Lem Pralon               1.00 Bh 29,000 29,000.00
53 Talang Air                2.00 Bh 100,000 200,000.00
54 Fiber Glass Kap. 1 M3               1.00 unit 1,860,000 1,860,000.00
55 Sambungan Pipa               6.00 Bh 4,000 24,000.00
56 Timbangan untuk balita               1.00 Bh 400,000 400,000.00
57 Timbangan untuk dewasa (lantai)               1.00 Bh 200,000 200,000.00
58 Tempat Tidur Pasien + tilam/busa               1.00 Bh 700,000 700,000.00
59 Kursi Busa (lipat)               2.00 Bh 270,000 540,000.00
60 Kursi Tamu (ruang tunggu)               1.00 set 1,500,000 1,500,000.00
61 Meja Pelayanan               1.00 Bh 400,000 400,000.00
62 Lemari obat / dokumen               2.00 Bh 600,000 1,200,000.00
63 Lampu 8 Watt                2.00 Bh 35,000 70,000.00
64 Lampu 25 Watt                5.00 Bh 45,000 225,000.00
65 Saklar Tunggal               4.00 Bh 10,000 40,000.00
66 Saklar Ganda               4.00 Bh 15,000 60,000.00
67 Stop Kontak               8.00 Bh 11,000 88,000.00
68 Kabel NYM 2 x 2.5 mm             41.00 M' 14,000 574,000.00
Jumlah Bahan 128,596,000.00
II. SEWA ALAT  
1. Gerobak Dorong 2.00  Bh  200,000.00 400,000.00
Jumlah Alat 400,000.00
III. UPAH
1. Pekerja           130.00 HOK 85,000.00 11,050,000.00
2. Tukang           101.00 HOK 120,000.00 12,120,000.00
3. Kepala Tukang             27.00 HOK 140,000.00 3,780,000.00
4. Mandor             10.00 HOK 120,000.00 1,200,000.00
268.00 HOK Jumlah Upah 28,150,000.00
IV. HONOR TPK 
1. Ketua 1.00 org 450,000.00 450,000.00
2. Sekretaris 1.00 org 400,000.00 400,000.00
3. Anggota 2.00 org 350,000.00 700,000.00
(Perbup Sanggau No. 1 Thn. 2019)
4.00 org Jumlah Honor TPK 1,550,000.00
J  U  M  L  A  H  (Rp.) 158,696,000.00
Pasir Bedengung, 1 Februari 2020
Disetujui :
Kepala Desa Pasir Bedengung Kasi Kesejahteraan
Bunga Citra Lovestory, SH. Ramlee

Posting Komentar untuk "Desain dan RAB Pembangunan Polindes (Konstruksi Kayu)"